Washington, DC
September 26 - Octorber 6, 2002
Our team is a collaborative effort
between the departments of architecture, industrial design, building
construction, and mechanical and electrical engineering. It has been
in the process of design since the summer of 2001. Designed and built
by students with faculty counsel, the project is an integral example
of the tri-fold mission of the university - teaching, research, and
outreach. This unique house utilizes innovative materials and systems
to reduce energy demand while improving the spatial quality of residential
living.
|